Field By The Numbers
- Building Square Footage: 83,791 ft2
- Number of Teaching Spaces: 57
The majority of the referendum work for Field was completed during the 2025-2026 school year and covered significant upgrades in Health, Safety, and Security; Mechanical and Infrastructure; and Classroom Improvements.
Below is a list of completed projects and our plan to maintain these systems while addressing any items we could not fund with the referendum.
Health, Safety, and Security
-
Abatement of hazardous materials.
-
Replaced room signage.
-
Replaced classroom doors and hardware.
-
Replaced interior corridor (hallway) doors, frames, and hardware.
-
Replaced chain-link fencing.
Mechanical and Infrastructure Improvements
- Replaced lockers.
- Replaced toilet partitions in the restrooms.
- Replaced ceiling tile.
- Replaced flooring and carpet.
- Replaced fluorescent lights throughout the building with LED lights.
- Replaced exterior lighting fixtures.
- Added new underground detention for the new playground.
- Repainted the building as needed.
- Replace the playground equipment and surface. (To be completed during summer 2026.)
- Replaced classroom sinks and retrofitted faucets to be hands-free.
- Replaced water fountains.
- Replaced galvanized piping in the walls.
- Replaced sinks and retrofitted faucets to be hands-free in the restrooms.
- Replaced mop sinks.
- Replaced BFP with RPZ backflow to the mop sinks.
- Replaced urinals.
- Replaced wash fountains with sinks.
- Replaced toilets.
Classroom Renovations
- Replaced countertops.
- Replaced cabinets.
Classroom Additions
- A second floor addition was built on top of the recent full-day kindergarten addition.
Following the support of our referendum, we are fulfilling our commitment to long-term fiscal responsibility by reevaluating our 30-year facility roadmap. We have partnered with McKinstry, a leading strategic facility planning partner, to perform independent, third-party engineering assessments of our building systems. This partnership provides the District with a live system for tracking asset health and remaining life, allowing us to stay ahead of repairs and protect the community's investment in our schools for decades to come.
-
Field Engineering
June 2026
McKinstry engineers begin a comprehensive physical assessment of all eight District schools to catalog every major building system (HVAC, electrical, plumbing, and roofing).
-
immediate tracking
Summer 2026
New equipment installed during recent construction projects is added to our 30-year roadmap to ensure we are tracking its health from day one.
-
Financial Modeling
Fall 2026
Field data is analyzed to determine the observed remaining life of our assets.
This phase involves building a customized financial dashboard to predict repair costs and prioritize work based on educational impact.
-
Plan Finalized
Fall 2026/Winter 2027
The Board of Education will review the final report and refined 30-year plan.
This data-driven roadmap will be used to guide all future capital budget decisions.
Once the McKinstry study is finished, we will add the projects that were not included in the referendum here.
Field's Construction Budget
| Total construction budget | toTal Cost Via Bid |
|---|---|
| $11,676,898 | *$11,458,915 |
*For the purpose of this illustration, we have combined all the work being funded by the referendum and our Capital Fund 60. This amount also includes the playgrounds.